Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JDL-350 water and gas dual-use series drilling rig is a multi-functional drilling machine integrating water drill and air drill. It is the first in China. The rig adopts the 525 gearbox for automobile, the transmission efficiency is doubled compared with the hydraulic transmission, and the power consumption is reduced by 35%, which is more efficient and energy-saving. The drilling rig has a high speed and can be drilled with a mud pump to solve the difficulty of drilling the soil air DTH hammer. The boring machine has a large torque and can slide up and down. DTH can be used when working with hard rock layers, gravel and pebble layers under deep wells. DTH hammer drilled. The drilling rig can be specialized in drilling, monitoring wells, geothermal air conditioning drilling, diamond bit wireline core drilling, engineering geological investigation operations.
1. The rotate speed of the drilling rig can reach 27-906r/min, and the maximum output torque is 9500N.m, which can be used for diamond core drilling.
2. The drilling rig is equipped with a hydraulic drill tower, hydraulic supporting legs, winch, and the power head can slide up and down. The hard rock can be used for DTH hammer drilling.
3. The rig adopts long-stroke double-speed mechanism and mechanical power head, and the power head stroke is 3500mm, which is used to improve drilling efficiency and reduce the occurrence of blockage and burning drill accidents.
4. The drilling rig adopts double oil pump for oil supply. When drilling, it uses single pump, and when lifting drill rods, it uses double pump to merge; the power loss is small and the auxiliary time is short.
5. The drilling rig adapts crawler chassis, the stroke of the outrigger cylinder is 1.5m, the hydraulic high supporing legs can stretch flexiable and load into the truck freely, which is convenient for relocation and transportation.
Drilling capacity | Mud drilling depth | 600m |
NQ Wireline drill | 530m | |
Ø 89 Air drilling | 350m | |
Drilling diameter | 75-350mm | |
Feeding system | Lifting capacity | 12Ton |
Thrusting capacity | 8.5Ton | |
Feeding length time | 3500mm | |
Gearbox | 525 | |
Drive head | Forward Rotary speed | 27/52/93/122/155/192/435/733/906 r/min |
Revised Rotary speed | 31/265 r/min | |
Power head feature | Hydraulic lock for opening & closing | |
Max. Torque | 9800N.m | |
Drilling method | Mechanical top head rotation, hydraulic feeding, work with mud pump or DTH hammer | |
Loose soil layer and bed rock ( Hardness: F6~20 ) | ||
Power unit | Engine Model | Yunnei YN33GBZ |
Rated power/speed | 58kW/2400rpm | |
Winch capacity | Mechanical winch | 5 Ton |
Hydraulic tool winch (optional) | 1.5 Ton | |
Drill pipe | Drill pipe dia. (optional) | DTH drill rod Ø 76/ Ø89 |
Water well Ø 50/60mm | ||
Wireline coring BQ NQ HQ PQ | ||
Drill pipe length | 3m | |
Air compressor | Air consumption | 16~35m3/min |
Air pressure | 10.5~25.0bar | |
Crawler chassis | Walking speed | 0~2 km/h |
Steel crawler & hydraulic high legs | Can stretch flexible & convenient for loading | |
Climbing angle | 20° | |
Dimension | Transport size | 5200*1575*2500mm |
Working size | 3480*1575*8350mm | |
Weight | 6300KG |