200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Year
Manufacturer/Factory, Trading Company
Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
<100 square meters
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
  • 200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
Find Similar Products
  • Overview
  • Product Description
  • Product Features
  • Product Parameters
  • Related Photos
Overview

Basic Info.

Model NO.
YZJ-200Y Crawler Type Geotechnical Drilling Rig
Certification
ISO 9001:2000, ISO 9001:2008
Condition
New
Motor
Diesel Engine
Drill Hole Diameter
76-500mm
Drill Hole Depth
200m
Bit Type
Diamond Bit
Drilling Way
Rotary
Drill Rod Caliber
50mm Cr50 Aw Bw Bwj
Usage
Geotechnical Investigation, Water Well
Tower
Hydraulic Tower
Configure
with Bw-160 Mud Pump Integrated
Transport Package
Striped Plastic Packing or Plywood Case Packing
Specification
200
Trademark
Miracleland
Origin
Changsha, Hunan, China
HS Code
8430490000
Production Capacity
20 Sets/Month

Product Description

Product Description

YZJ-200 Crawler Mounted Water Well Drilling Rig:

It is widely used in the geological general investigation and exploration, road, railway, port, bridge, water conservancy, tunnel and tall building basic exploration, kinds of hole in concrete structure, river, levees, subgrade grouting hole drilling and direct grouting, civil wells and earth central air conditioner, and etc.
 
Product Features

1. Diesel engine and electric motor as power.(convenient for places of insufficient of  electricity)

2. Integrative Drilling Tower:
Tower is supported by two high strength oil cylinder, hydraulic controlling the rise and fall of the tower. The operation is extremely convenient, saving time and labor effort,creating maximum benefit for the user.
 
3. Crawler mobile base or trailer mobile base
The chassis used crawler /trailer type achieve rapid turnarounds, very convenient for movement.
 
4. Long stroke hydraulic supporting leg can be used for transportation, loading and unloading of the drill automatically without the help of the lifting equipment. The hydraulic leg can rapidly make the drill level in the coordination with the universal level instrument.
 
5. electric-start diesel engine,
It  greatly reduces the labor intensity of operators, especially more efficient in the cold season when the diesel engine start is difficult, showing its great advantage.
 
6. The machine is equipped with a complete set of independent BW - 160 mud pump, with high pump flow rate and pressure, convenient maintenance, convenient to buy spare and accessory parts all around.
 
Product Parameters

 

The technological data of YZJ-200 crawler mounted hydraulic drilling rig:

Rig Model YZJ-200
Drilling depth 200m
Drilling hole diameter 300-75mm
Drill rod diameter 42mm 50mm AW BW
Drilling angle 90°~75°
Power 15kw
Drill weight ( include power, tower etc ) 3500kg
Size 3500x1950x2700mm
spindle speed 64,128,287,557,860r/min
Spindle stroke 450mm
Crawler size/Piece 350x90x48mm
Climbing angle 20°
Moving speed 10km/h
Hydraulic landing leg valid height 1300m
Rated load 5000kg
Drill tower structure Full hydraulic
Effective height 6.5m
Mud pump model BW-160
Mud pump Displacement 160L/min
Maximum pressure 1.3 Mpa
Reciprocating frequency 165 times/min
Inlet hose diameter 51mm
Outlet hose diameter 32mm
 
Related Photos

 

200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)
200m Crawler Mounted Geotechnical Investigation/Water Well Drilling Core Drill Rig with Bw160 Mud Pump (YZJ-200Y)


 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier