Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XY-3 Core Drilling Rig:
It is widely used in the construction of the projects e. G. Prospecting, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploration, large diameter boring pile and small diameter diamond core deep hole drilling, etc.1. With hydraulic automatic feeding structure, the drilling efficiency is high;
2. With socket pressure gauge indicates pressure, easy to grasp the hole situation;
3. Equipped with normally closed hydraulic chuck, operation is flexible and reliable;
4. The drilling rig adopts mw525 automobile gearbox assembly, Yunnei 490 automobile power assembly, with 10 speed series and reasonable speed regulation range, large torque and strong bearing capacity;
5. Large engine power and two reverse rotation gears, can easily solve the water well drilling work accident;
6. Rig bulk portfolio, the whole removable nature, transportation, relocation convenience, and not subject to topography constraints;
7. The rig using a mechanical drive, rotary structure, rotary torque, long life;
8. Rig is easy for operation, with high performance, easy maintenance, less investment and quick returns.
The technical parameter of XY-3 bore well drilling machine
Drilling depth | 600m |
Borehole diameter | 300-75mm |
Max open hole caliber | 300mm |
End hole caliber | 75mm |
Drilling Rod diameter | Φ50 Φ60 |
Drilling angle | 90°--65° |
Spindle | |
Spindle speed | 30-1050r/min |
Spindle stroke | 29-137r/min |
Spindle stroke | 60mm |
Spindle inner diameter | 96mm |
Lifting capacity | 6000kg |
Hoist | |
Max.Single line lifting speed | 0.5-1.9m/s |
Wirerope caliber | 12.5mm |
Max.Single line lifting capacity | 4000kg |
Reel diameter | 300mm |
Wirerope length | 50m |
Maximum lifting capacity of single rope | 3000kg |
Mud pump | |
Type | Horizontal three cylinder BW-250 |
Displacement | 250L/min |
Work pressure | 80kgcm² |
Water inlet pipe diameter | 75mm |
Water outlet pipe diameter | 50mm |
Gear Oil pump | |
Duplex gear oil pump | CBF-F63/25 |
Front Displacement, pressure | 63L/min 20Mpa |
Water outlet pipe diameter | 25L/min 20Mpa |
power | |
Diesel engine | (Yunei490) 42KW |
Electric machinery | 30KW |
Weight size | |
Drill weight | 1600KG |
Shape size | 2500×900×1800mm |